Environmental Impact Assesment Report (EIAR)
Volume 1 - Non - Technical Summary & Main Report
Table of Contents
Non - Technical Summary
Ch 1 Introduction
Ch 2 Background to the Proposed Project
Ch 3 Site Selection and Reasonable Alternatives
Ch 4 Description of the Proposed Project
Ch 5 Population and Human Health
Ch 6 Biodiversity (part 1)
Ch 6 Biodiversity (part 2)
Ch 7 Ornithology
Ch 8 Land Soils & Geology
Ch 9 Hydrology & Hydrogeology
Ch 10 Air Quality
Ch 11 Climate
Ch 12 Noise & Vibration
Ch 13 Cultural Heritage
Ch 14 Landscape & Visual (Part 1)
Ch 14 Landscape & Visual (Part 2)
Ch 15 Material Assets
Ch 16 Major Accidents and Natural Disasters
Ch 17 Interaction of Effects
Ch 18 Schedule of Mitigation
Bibliography
Volume 2 Photomontage Booklet
Viewpoint 1 – Mountkelly
Viewpoint 2 – Carrownaseer South
Viewpoint 3 – Carrownagarraun
Viewpoint 4 – Pollacoragune
Viewpoint 5 – Timadooaun
Viewpoint 6 – Kippaunagh
Viewpoint 7 – Rahogarty North
Viewpoint 8 – Knock
Viewpoint 9 – Kilmurry
Viewpoint 10 – Mahanagh
Viewpoint 11 – Knockroe
Viewpoint 12 – Gorteen
Viewpoint 13 – Cashel
Viewpoint 14 – Cloonmweelaun
Viewpoint 15 – Killavoher
Viewpoint 16 – Cloonagawnagh (East)
Viewpoint 17 – Cloonagawnagh (West)
Viewpoint 18 – Ballyedmond
Volume 3 - Appendices
Volume 3a - Table of Contents
2-1 Community Consulation Report
2-2 Copies of EIA Scoping Responses
2-3 Projects considered in the EIA Cumulative Assessment
4-1 Site Layout Drawings (Proposed Wind Farm)
4-2 Site Layout Drawings (Proposed Grid Connection)
4-3 Peat and Spoil Management Plan
4-4 Construction and Environmental Management Plan
4-5 Surface Water Management Plan
4-6 Decommissioning Plan
4-7 Construction Methodology Report (TLI)
5-1 Wind Farms & Health Literature Review - Chapman 2015
5-2 EMF & You: Information about Electric & Magnetic Fields and the electricity transmission system in Ireland
5-3 House Prices Study - CXC Scotland 2016
6-1 Turbine Base Botanical Study
6-2 Bat Report
6-3 Aquatic Baseline Report
6-4 Invasive Species Management Plan
6-5 Confidential Appendix
6-6 Biodiversity Management and Enhancement Plan
Volume 3b - Table of Contents
7-1 Species List
7-2 Survey Effort
7-3 Summary Tables
7-4 Survey Data
7-5 Confidential Survey Data
7-6 Collision Risk Assessment
7-7 Bird Monitoring Programme
8-1 Peat Stability Risk Assessment Report
8-2 Borehole Logs
9-1 Flood Risk Assessment
9-2 Surface Water Laboratory Certs
9-3 Groundwater Quality Data
9-4 Groundwater Laboratory Certs
9-5 Water Framework Directive Assessment
11-1 Carbon Calculations
12-1 Decomissing and Construction Noise Report
12-2 Operational Noise Report
13-1 Photographic Record
14-1 LVIA Methodology
14-2 Landscape Character Assessment Tables
14-3 Photomontage Assessment Tables
14-4 LVIA Baseline Map
14-5 Photowire Visualisation Booklet
15-1 Traffic Management Plan
15-2 Road Safety Audit
15-3 Traffic Count Data
15-4 Figures 15-6 to 15-27
15-5 Three Ireland Impact Assessment Report
Natura Impact Statement (NIS)
Appropriate Assessment Screening Report & Natura Impact Statement (NIS) (part 1)
Appropriate Assessment Screening Report & Natura Impact Statement (NIS) (part 2)
NIS Appendix 1 Aquatic Baseline Report
NIS Appendix 2 EIAR Chapter 4 – Description
NIS Appendix 3 EIAR Chapter 9 – Hydrology and Hydrogeology
NIS Appendix 4 Invasive Species Management Plan (ISMP)
NIS Appendix 5 List of Plans and Projects Considered during the Cumulative Assessment
NIS Appendix 6 Construction Environmental Management Plan (CEMP)